Adherence to a detailed schedule and logistics plan was critical to meeting the tight timeline.

UCM continually upgrades their equipment to stay current with cutting edge technology. This project involved working within the existing and operational surgical floor to install the structural support and infrastructure for the a new surgical microscope in OR 429.

The project scope included structural connections from the ceiling deck to support the new microscope mount. Ceiling and wall demolition was required to accommodate power and video conduit and cabling runs.

This fast-track technical project was completed over a single weekend to minimize impact to the existing outpatient services. As the process included removal and replacement of the existing ceiling to allow the installation, robust infection control measures were required to protect the health and safety of the UCM patients at all times.

Location:

Chicago, IL

Client:

University of Chicago Medical Center

Value:

$70K

Scope:

Complex Occupied Renovation

Delivery:

Design-Bid-Build

Size:

500 SF