Search Results


Roosevelt Road Metra Train Station

This challenging, high-profile project required complicated scheduling to coordinate day and night shifts with Metra track closures.

The project scope included rebuilding the existing platforms and adding two new towers with elevators and stairs to each platform to connect to the 11th Street bridge. The reconstruction resulted in a fully accessible and ADA compliant train station. The 300’ long train platforms are constructed from a polymer composite material to withstand harsh weather. Fare-vending houses with a canopies and a warming house were installed on the outbound platform.

As most of the construction was completed during non-rush-hour periods to ensure minimal disruption to passengers and train traffic, the station was operational and throughout the construction period.

 

Location:

Chicago, IL

Client:

Chicago Department of Transportation

Value:

$10.4M

Scope:

New Construction – Addition / Renovation

Delivery:

Design-Bid-Build

Looking for your next career opportunity? Learn More